by treyjackson | Sep 26, 2024
As part of a larger system, provide a community tap stand connected directly to piped water. New boreholes are drilled to 1,000+ feet, (or existing boreholes rehabilitated) and equipped with a submersible pump powered by solar panels. A 50,000 liter central reservoir...
by treyjackson | Oct 7, 2024
Provide piped water directly to the household. In communities where population density is high (300+ households), a borehole is drilled and equipped with a submersible pump that transports water through pipelines to every household. (serves 1,500 – 2,000 people)...